Nepal possesses an estimated 83,000 MW of theoretical hydropower potential, with approximately 40,000 MW deemed technically and economically viable.
Current Status and Generation
- Installed Capacity (2025): Approximately 3,422 MW (with hydropower contributing $\sim 3,256$ MW).
- Expansion Target (FY 2025/26): Planned addition of $942$ MW, targeting a cumulative total of $\sim 4,800$ MW.
- Under Construction: $259$ projects with a combined pipeline capacity of $\sim 10,692$ MW.
- Dominant Technology: Over $90%$ of generation comes from Run-of-River (RoR) plants, leading to seasonal production fluctuations.
Institutional Framework and Major Projects
- Grid Management: Managed by the state-owned Nepal Electricity Authority (NEA).
- Key Projects: Upper Tamakoshi ($456$ MW) and Kali Gandaki A ($144$ MW) are among the largest completed installations.
- Power Export: Power trade agreements enable bilateral exports to India, strengthening sub-regional energy security.
- Category
- Economic Indicator
- Fiscal Year
- 2082
- Key Figure/Rate
- Potential: 83,000 MW, Installed: ~3,422 MW