Nepal's Hydropower Potential
Blessed with a vast river system originating in the Himalayas, Nepal possesses immense water resources with the potential to transform its economy through clean energy production and regional power export.
Capacity and Potential
- Theoretical Hydropower Potential: Approximately $83,000\text{ MW}$
- Economically and Technically Feasible Potential: Approximately $42,000\text{ MW}$
- Installed Generation Capacity: Crossed $3,000\text{ MW}$ as of mid-2024, showing rapid growth compared to less than $1,000\text{ MW}$ a decade ago.
- Generation Mix: Over $95%$ of Nepal's electricity is generated from eco-friendly run-of-the-river (RoR) hydropower plants, leading to seasonal imbalances (surplus in monsoon, deficit in winter).
Key Hydropower Projects
Project Name Capacity Type Status / Remarks Upper Tamakoshi $456\text{ MW}$ Peaking RoR Operational; largest completed domestic project, developed using national resources. Kaligandaki A $144\text{ MW}$ Peaking RoR Operational; key baseload plant in central Nepal. Middle Marsyangdi $72\text{ MW}$ RoR Operational. Arun III $900\text{ MW}$ Peaking RoR Under construction; being developed by India's SJVN under a BOOT model. Budhigandaki $1,200\text{ MW}$ Storage Proposed reservoir project; critical for addressing winter dry-season deficits. Power Trade and Bilateral Agreements
- Power Trade Agreement (PTA) with India (2014): Established the framework for bilateral electricity trading and grid synchronization.
- Ten-Year Power Export Target: In early 2024, Nepal and India signed a bilateral agreement targeting the export of $10,000\text{ MW}$ of electricity from Nepal to India over the next decade.
- Trilateral Power Trade: Initial agreements have been reached to export power to Bangladesh via the Indian transmission grid.
Structural and Environmental Challenges
- Hydrological Seasonality: Dry season (winter) river discharge drops to roughly $20% - 30%$ of peak summer flow, forcing Nepal to import electricity from India during winters despite summer surpluses.
- Transmission Infrastructure: Inadequate high-voltage transmission lines (such as cross-border and domestic transmission corridors) limit evacuation capacity.
- Geological and Climate Vulnerability: High risk of landslides, earthquakes, and Glacial Lake Outburst Floods (GLOFs) damaging infrastructure.